What We Do

Verizon Wireless NEC 1A Expansion

The Verizon Wireless Data Center for 4G LTE network capabilities required a complete build-out without shutdown of existing operations. RK Mechanical was responsible for all mechanical work, including plumbing, piping, sheetmetal and HVAC systems. RK Steel installed structural steel frames, stairs and miscellaneous metals for the project.

Region: Southern Colorado
Location: Colorado Springs, CO
Awards: Solutions: , ,