What We Do

Mechanical

Read about some of our biggest and most interesting projects.

Denver Hampton Inn and Homewood Suites (Dual Hotel)

RK Mechanical completed the conversion of an existing 12-story office building, including three mechanical penthouse levels and two below-grade levels. The hotel is a dual brand, splitting the floors between Hampton Inn and Homewood Suites. Each hotel has its own entrance, lobby and amenity spaces. The sub-basement consists of a parking garage and equipment rooms; […]

Central Plant Mission Critical Data Center

The Central Plant Mission Critical Data Center houses a 100,000 sq-ft mission critical Tier III data center. The remaining 900,000 SF is used for technical support and administrative space. The massive twenty building complex also includes water treatment facilities, chiller plants, electric substation, fire pump house, warehouse, vehicle inspection facility, visitor control center, and sixty […]

Aurora Organic Dairy Addition

The processing plant services various brands of organic milk sold in Colorado. This particular phase added a new processing line and additional cold storage to support the increased production. Before this phase, there were a little more than 200 storage positions. After completion, there will be over 1,200. RK Mechanical performed the entire scope of […]

White Wave Foods

The White Wave Foods project was a single story tenant improvement project within a recently built core & shell. White Waves was previously headquartered in Superior, but outgrew their facility, creating the need to build out a new facility. The new project included office space, various types of R&D food laboratories, clean rooms, product laboratories, […]

13th CAB USAFA Control Tower

Designed in accordance with NHERP criteria, the new air traffic control tower at the Air Force Academy in Colorado Springs was built to enhance the reliability of the air traffic control mission at the academy. Key features of the facility include an uninterruptible power supply, standby generator, redundant chiller systems, surveillance/security systems, wet pipe fire […]

Curtis Hotel Renovations

Originally constructed as an office and hotel space in the 1970’s, the 30-story Curtis Hotel was converted into a mixed-use building with the 336-room hotel occupying floors 1-16. In addition, the Curtis boasts a 4 level parking garage, grand ballroom, meeting space and two restaurants. RK Mechanical provided the fabrication, transportation and installation of the […]

Page 4 of 23 «...23456...»