What We Do

Mechanical

Read about some of our biggest and most interesting projects.

Walmart Supercenter

Walmart is the world’s largest supercenter, sharing practices and leveraging its supply chain to create economic opportunity around the globe. The Aurora supercenter was one of the first green-built Walmart retail centers ever constructed and was designed to reduce the amount of energy and natural resources needed to operate and maintain the center. It was […]

National Institute of Standards and Technology

The National Institute of Standards and Technology (NIST) is a high-performance laboratory and research space for a staff of 350 scientists, engineers, technicians and support personnel. The NIST conducts chemical, physical, materials and information sciences, and engineering research. RK Mechanical fabricated and installed the high-tech, mechanical system, featuring helium recovery, purification and liquefaction, lab high […]

Presbyterian St. Luke’s Rocky Mountain Hospital for Children

Centrally located in the heart of Denver, this 185,100 square foot, addition/renovation on the existing Presbyterian St. Luke’s Medical Campus created a unique healing environment, designed especially for children and their families. With a separate entrance and color scheme, this cutting-edge facility boasts a full-service pediatric emergency department, 53 pediatric beds, 10 pediatric ICU beds […]

The Four Seasons Hotel and Residences

The Four Seasons Hotel and Residences is a 45-story luxury hotel and residence located in the heart of downtown Denver. The building is the city’s fourth tallest building and features 232 hotel rooms, 102 residence units, an in-house spa, state-of-the-art fitness center, high-end restaurant and bar (Edge), and a fully-wired meeting space. RK Mechanical performed […]

1800 Larimer

1800 Larimer is a LEED Platinum-certified, 22-story office building. The building is a model of efficiency and innovation, featuring environmentally-friendly amenities, including a 17,000-square-foot, open-air, garden terrace, floor-to-ceiling windows, individual climate controls and a cutting-edge fitness facility. RK Mechanical fabricated and installed all mechanical systems, including plumbing, piping, sheet metal and HVAC.

Castle Rock Adventist Hospital Phases I & II

Opened in September 2011, Phase I of the Castle Rock Adventist Health Campus introduced a full-service emergency care facility with MRI, CT, ultrasound, digital mammography, digital X-ray and helipad for emergency patient transportation. It also provides access to Centura Health’s nationally accredited stroke and advanced trauma centers. Phase II opened in July 2013 with services including obstetrics, […]

Page 22 of 22 «...101819202122